0 0
0
No products in the cart.

On-Grid Solar Plant (5kW) with 10 years AMC Support

₹2,500.00  ₹300,000.00

Sold By: Solar Universe Store

  • Single Phase 5kW Grid Connected Solar Plant
  • Life of more than 25 years and payback period of less than 5 years
  • Generates approximately 7500 units of electricity per annum.
  • Panel Brands - DCR & ALMM Approved Solar Panels of 335W Polycrystalline Technology
  • Engineering & Designing, Testing and Commissioning Services of Grid connected Solar Power System with all the paper work including PPA.
  • Inclusive of Net Metering & related Services Cost.  
  • On Site - 10 Year AMC Support
  • Loan Facility Available 
  • Solar Subsidy available from central government. See the details in below section.
  • Subsidy amount is under direct benefit transfer scheme and will be credited in consumer acccount from MNRE within 2 months of Net Metering.
(Available)
Quantity

Past Experience

  • Success Impex Private Limited, is the solution provider
  • Implemented more than 10MW of residential solar projects.
  • This company has more than 19 years of experience in this field.

Plant cost 

  • Total Plant (5kW) cost is INR 300,000/- in Delhi, UP, Rajasthan, Punjab, & Haryana
  • Total Plant (5kW) cost is INR 316,055/- in Uttarakhand, HP, J&K and Assam
  • INR 3000 will be charges extra for site visit, documentation and file submission charges.

Government (Central / State) Subsidy (Under Direct Benefit Transfer Scheme)

  • Solar Subsidy of INR 58,352 in Delhi, UP, Rajasthan, Punjab, & Haryana from Central Government.
  • Solar Subsidy of INR 70,648 in Uttarakhand, HP, J&K and Assam from Central Government
  • Subsidy amount is over and above the offered price and will be credited in consumer account from MNRE within 2 months of Net Metering.

Net Plant cost for Consumer(in INR)

States Plant Cost Central Subsidy State Subsidy Net Cost
Delhi NCR 300,000 58,352 NIL 241,648
Haryana 300,000 58,352 NIL 241,648
Uttar Pradesh 300,000 58,352 NIL 241,648
Uttarakhand 316,065 70,648 NIL 245,417

Solar Plant Details.

  • Earthing Kit (both AC and DC side) with Grounding minerals, Eathing wire, electrode and strips and Lightining Arrestor
  • Distribution Box (2 input 2 output)  with IP65 & IP67 outer body with all the accessories required
  • AC Distribution Box (1 phase) with IP65 & IP67 outer body with all the accessories required
  • DC Copper flexible Cable ; Size 50 meter; Make: Poly cab/ Finolex / Equivalent
  • AC Copper flexible Cable ; Size 50 meter; Make: Poly cab/ Finolex / Equivalent
  • Solar Module Mounting Structure GI/MS for supporting the Solar Panels for RCC and tin sheet roof. 
  • Normal rooftop structure, without elevation considered.

Warranty / Support

  • Panel Warranty - 25 Years
  • Solar Inverter with 5 Years Warranty from the Inverter Manufacturer
  • On-Site Plant - 10 Year AMC Support.

Documentation Required

  • For ths subsidy and Net Metering, consumer to provide documents like Electricity Bill, Aadhar Card, PAN Card, Property Proof, Passport SIze Photo, Mobile & EMail, Roof Photo. 

Payment Terms

  • Booking payment of INR 2500 will be adjusted in total plant cost.
  • 90% Advance after the inspection.
  • 10% after the system commissioning and before the net metering

Timelines

  • Plant commissioning shall take 2-3 weeks in Delhi NCR and 4-5 weeks in other areas.
  • Net Metering shall take 4-5 weeks after the plant installation.

Finance Scheme Details (Optional)

  • Available for independent houses, industrial and commercial premises
  • Minimum for 3kW solar plant to 5 MW solar Plant i.e. INR 1.5 Lacs to INR 10 crores
  • Prerequiste
    • Processing Fees <=1%
    • CIBIL Score > 650
    • Business Vintage > 2 Years
    • Collatoral not mandatory
  • Financing upto 70% of Plant cost
  • Rate of Interest - 9-12%
  • Repayment term - Maximum 5 years (including 3 months moratorium period)
  • List of Documents - Last 3 years ITR, GST Return (Last Year), KYC DOcuments, 6 Months Electricity Bill, 12 Months Bank Statement, Vintage Proof - Incorporation Certificate, Ownership Proof - Latest Property Tax Bill + Paid Receipt.

4.75

(4)
5 Stars
75%
4 Stars
25%
3 Stars
0%
2 Stars
0%
1 Star
0%

Add your review

Your email address will not be published. Required fields are marked.

Please login to write review!

Upload photos

4 review(s) for "On-Grid Solar Plant (5kW) with 10 years AMC Support"

Solar Universe Store

Solar universe India (sui) is one of the world's most innovative solar engineering companies that designs, prototypes, manufactures and distributes all of the products seen on this site.

Our product range includes - solar powered - lanterns & lamps, home lighting systems, conventional street lights, all in one street lights, garden/lawn/exterior lights, table & pedestal fans, charge controllers, SMUs, inverters & power packs, pv modules & panels, water pumps (submersible & openwell), led lighting, solar rooftop installations, its ancillaries & accessories, micro grids & solar fencing systems.

We are vertically integrated solar company having its foothold in more than 23 states in India & 18 countries across the globe. All the products displayed by us are backed by sufficient warranties and spares for all our products are easily available. 

More Products from Solar Universe Store

On-grid means your solar system is tied to your local utility's GRID. This is what most residential homes will use because you are covered if your solar system under or over-produces in regard to your varying energy needs. All this means for you is that your utility system acts as your battery space

What Is Off-Grid and On-Grid Solar Energy? An off-grid solar energy system is not connected to the utility grid, whereas an on-grid (aka grid-tied) solar energy system is connected to the utility grid.

On-grid systems are generally considered cheaper to install than off-grid systems due to lower materials cost, for example, there is no need to invest in batteries to store any excess energy produced as the grid itself acts as a virtual battery. Costs associated with maintenance or replacements are also reduced.

Solar energy systems with a capacity of up to 3 kW are eligible for a subsidy of up to ₹14, 588/ kW. For a system capacity between 3 kW to 10 kW, ₹14,588 /kW is applicable for the first 3kW and ₹7,294/kW for the rest of the capacity. For plant capacities above 10kW, a fixed amount of ₹94822 will be given. Please refer the latest policy update on MNRE Website.

Consumer has to pay total plant cost to Digital Discom, while the applicable subsidy shall come to consumer bank account within 2-4 months, after filing all the plant commissioning documents. Digital Discom's service provider, shall facilitate the consumer in proper filing to get the subsidy.

Yes, Digital Discom Service provider has tie-up with multiple non-banking financial institutions, which can provide the loan for the solar plant and this can be upto 70% of the solar system cost, subject to the financial credit rating of the consumer. For these loans, the Rate of Intertest is between 9% to 12%.